3D Project (Product Design) series 2015 - "Building Machines for object engineering Season 1" by "StAlMaGiC DeSiGn" workshop
SETTING SQUARE S-19/16! ------------------------------------ The instructional type S-19/16 is used for the adjustment of 19 ropes Ø 15.7 mm for large-scale bridges, which are then pre-loaded. It consists of a two-piece cone funnel, a teaching boom with 2 x 19 cone holes and 38 pcs. wedges. First there may be a beam of 19 central ropes and then ropes along the periphery of the teaching rope. Working with this type of pedestal is simplified, it is much faster to set all elements of the set angle and thus shorten the procedure of the extension. The production of the boiler is much faster and cheaper. Ribbed metal tube S-7/16! ------------------------------------ Ribbed metal tubes of this type are 60/55 mm in diameter and serve to protect the beam from 7 ropes from concrete when prestressing the ropes of a building object. If the ribbed pipes continue, there are metal ribbed mufs of a slightly larger diameter in which the pipes are twisted. FIXED COVER S-1/16! ----------------------------- The fixed boiler consists of a cone with a conical hole, a wedge holder, a spring, a wedge...
http://stalvisualdesign.com/